Mailing Lijst lml@lancaironline.net Bericht #33531
Van: Marvin Kaye <marv@lancaironline.net>
Onderwerp: Re: [LML] Re: Operating over congested areas
Datum: Sun, 25 Dec 2005 21:04:10 -0500
Aan: <lml>
Posted for <bjburr@mwheli.com>:

 Charlie,
 I don't have a beef.  I was only going through a few older messages in the
 list.  I decided to re-read my own ops specs and publish the wording.  It
 was then that the questions arose that I posted.  I wanted to see if there
 are differences in other's aircraft ops specs, to see if the wording in my
 ops specs is consistent with current FAA policies and interpretation.
 
 My only suggestion is that there should be a specific reference to the Phase
 I testing period in paragraph (5) and then the governing language of
 paragraph (24) once entering Phase II for general operations.
 
 Thanks for your help.
 
 Bryan
 N132BB
 
Inschrijven (FEED) Inschrijven (DIGEST) Inschrijven (INDEX) Uitschrijven Mailen naar Listmaster