Alan,

Our experience in Lancair's Shop was very productive and enjoyable in the
one week that was available when we picked up our kit. My 2 cents worth:

First week goal
1.  Close wings (inspect fuel sealant for thin or missing coverage
everywhere and inside vent/transfer areas), horiz stab (be careful not to
over trim stab trailing edges) and elevator
2.  Close vertical fin
3.  Bond horiz Stab in
4.  Bond center section in

Second week goal
5.  Complete canopy
6.  Rudder leading edge closeout
7.  Flaps fit to wings

Third week ??? (you will probably be glad you did)

I would not do the main gear, if time permits install the nose gear and
door.  Push to get as much done as possible, stay as long as you can too. Steve Colwell