Bill,

Thanks for the info.  I will be ordering very very soon.  After I remove an
un-necessary and large fast-on ground terminal block, I have a loose 5x7 area
on the left side of the firewall which I will check for depth.  I have the VM
EPI 800 system and generally don't see CHT's higher than 380-390 in warm
weather climb so I didn't think I would need the CHT monitor either.  I see
that the Unison parts matrix suggests "APM 1-96 (CHT Control)" for the I/O
320 and "SL1-95,SL2-95 (no CHT)" for the O 320.  I don't mind if it is
required, it's just that I don't know  which probe to request - dual point
"J" or "K" so I can continue to feed the EPI 800.

Thanks again,

Scott Krueger


LML website:   http://www.olsusa.com/mkaye/maillist.html
LML Builders' Bookstore:   http://www.buildersbooks.com/lancair

Please send your photos and drawings to marvkaye@olsusa.com.

Regjistrohu (pėr LAJME Automatike) Regjistrohu (pėr KLASIFIKIME) Pajtohu (pėr INDEKSIME) Ē'regjistrohu Shkruaji Administratorit tė Listės