Mesazhi #33462 i Listės sė E-mailave flyrotary@lancaironline.net
Nga: Al Gietzen <ALVentures@cox.net>
Lėnda: RE: [FlyRotary] Re: EC2 Current Requirements
Data: Thu, 31 Aug 2006 09:49:50 -0700
Pėr: 'Rotary motors in aircraft' <flyrotary@lancaironline.net>
I've designed in quite a bit of electrical dependancy, so the
alternator-out running time has me concerned.  With all injectors and
coils on seperate switches, it should be possible to extend the range by
switching off a set of injectors and the trailing coils, and accepting
reduced power.  Does that sound viable?
-------------

I guess you meant "electrical redundancy".

On my 20B install, a 15A fuse blew running 3 LS1 coils.  20A seems to be OK.

Does pulsing two injectors take more current than pulsing one injector twice
as long?

Al

Regjistrohu (pėr LAJME Automatike) Regjistrohu (pėr KLASIFIKIME) Pajtohu (pėr INDEKSIME) Ē'regjistrohu Shkruaji Administratorit tė Listės