X-Virus-Scanned: clean according to Sophos on Logan.com Return-Path: Received: from zproxy.gmail.com ([64.233.162.198] verified) by logan.com (CommuniGate Pro SMTP 5.0.8) with ESMTP id 1036393 for flyrotary@lancaironline.net; Thu, 16 Mar 2006 15:30:07 -0500 Received-SPF: pass receiver=logan.com; client-ip=64.233.162.198; envelope-from=barrygardner@gmail.com Received: by zproxy.gmail.com with SMTP id l1so467546nzf for ; Thu, 16 Mar 2006 12:29:24 -0800 (PST) DomainKey-Signature: a=rsa-sha1; q=dns; c=nofws; s=beta; d=gmail.com; h=received:message-id:from:to:references:subject:date:mime-version:content-type:x-priority:x-msmail-priority:x-mailer:x-mimeole; b=QyjQjVJ3/NRDzr8K+dSRbywUUyqIDuRMu5woju0EN1OMrqFI8UeDMsLHKHPlJynKZnoMeT4wDq0C7DpeEm09FfdYfmiVlcLOP/n4ND8NDA8ocQgmXsriC4zYOehi4b37W7MN+rM+CLctYSVjKJ7q2h+co5g+HcDJo+eeTTZaluM= Received: by 10.65.119.6 with SMTP id w6mr1508642qbm; Thu, 16 Mar 2006 12:29:23 -0800 (PST) Return-Path: Received: from dellc400 ( [75.4.73.65]) by mx.gmail.com with ESMTP id e16sm2726053qbe.2006.03.16.12.29.22; Thu, 16 Mar 2006 12:29:23 -0800 (PST) Message-ID: <02e701c64938$4add9670$6401a8c0@dellc400> From: "Barry Gardner" To: "Rotary motors in aircraft" References: Subject: Re: [FlyRotary] Re: installed cost of rotary Date: Thu, 16 Mar 2006 14:29:13 -0600 MIME-Version: 1.0 Content-Type: multipart/alternative; boundary="----=_NextPart_000_02E4_01C64905.FF5DF690" X-Priority: 3 X-MSMail-Priority: Normal X-Mailer: Microsoft Outlook Express 6.00.2900.2670 X-MimeOLE: Produced By Microsoft MimeOLE V6.00.2900.2670 This is a multi-part message in MIME format. ------=_NextPart_000_02E4_01C64905.FF5DF690 Content-Type: text/plain; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable MessageRusty, you caught me! I figured one way to win the argument about = whether a Lyc could be installed in 150 hours was to put one finger on = the scale when you weren't looking! If I brought enough beer.... Barry ----- Original Message -----=20 From: Russell Duffy=20 To: Rotary motors in aircraft=20 Sent: Thursday, March 16, 2006 1:51 PM Subject: [FlyRotary] Re: installed cost of rotary I'd come to watch that 150 hour Lyclone install sometime and I'd bring = the beer!=20 If you bring too much beer, it certainly won't get done in 150 hours = :-) =20 Best of luck with that Lyclone and thanks for contributing your = experience to our discussions. Thanks Barry. I'm happy to contribute what I can, and I don't really = want to be seen as anti-rotary just because I'm choosing a Lyclone for = the RV-8. I do plan to get back to the single rotor as soon as the RV-8 = is flying. I crank it every couple week to keep it healthy. =20 Cheers, Rusty (sneaking out toward the garage) ------=_NextPart_000_02E4_01C64905.FF5DF690 Content-Type: text/html; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable Message
Rusty, you caught me! I figured one way = to win the=20 argument about whether a Lyc could be installed in 150 hours was to put = one=20 finger on the scale when you weren't looking! If I brought enough=20 beer....
 
Barry
----- Original Message -----
From:=20 Russell=20 Duffy
Sent: Thursday, March 16, 2006 = 1:51=20 PM
Subject: [FlyRotary] Re: = installed cost=20 of rotary

I'd come to watch that 150 hour = Lyclone=20 install sometime and I'd bring the beer! 
 
If you bring too much beer, it certainly = won't get done=20 in 150 hours :-)   
 
 Best of luck with that Lyclone and thanks for contributing = your=20 experience to our discussions.
 
Thanks=20 Barry.  I'm happy to contribute what I can, and I don't = really want=20 to be seen as anti-rotary just because I'm choosing a Lyclone for the=20 RV-8.  I do plan to get back to the single rotor as soon as = the RV-8=20 is flying.  I crank it every couple week to keep it=20 healthy.  
 
Cheers,
Rusty=20 (sneaking out toward the = garage)
------=_NextPart_000_02E4_01C64905.FF5DF690--