|
Scott,
Rusty beat me with really good photos........The photo of Atkins engine (I guess
its his) has the "Pewersport" type of mount utilizing the intermediate housing
pad in question and it looks as though they drilled and tapped two extra holes
for the mount........From Rusty's photos looks like they have to be drilled into
the water jacket to avoid the through bolts.......Try to get a drill diagram from
Dave Akins so as to avoid these bolts or have a housing available to make
sure to miss the bolts.......Also you will have to seal the bolt threads well or
use an O-ring , etc to avoid coolent leaks........IMHO
-- Kelly Troyer Dyke Delta/13B/RD1C/EC2
-------------- Original message from keltro@att.net (Kelly Troyer): --------------
Scott,
I just opened a 89-91 13B........Will look at what you will be drilling into
tomorrow and report what I find unless someone beats me to it !
-- Kelly Troyer Dyke Delta/13B/RD1C/EC2
-------------- Original message from Scott <squiggles@yahoo.com>: --------------
> Hello All... > > I am looking to drill two more holes( there are > currently 4 holes, 2 for the primary injector rail and > 2 for ??? ) in the pad on the top of the intermediate > housing where the fuel rail for the primary injector > bolts onto for the 86-92 6port. The idea is to use > this area as an engine mount point ala Atkins > approach( > http://www.americanrotaryengine.com/imagelib/sitebuilder/misc/show_image.html?li > nkedwidth=actual&linkpath=http://katkins.web.aplus.net/sitebuildercontent/sitebu > ilderpictures/dscf0250.jpg&target=tlx_new > ). However, in the interest of keeping the number of > items to fabricate down I had hoped to use the two > bolt holes on the pad for the primary injector rail. > > Thus, is it possible and wise to drill more holes on > this pad? Close up pictures of what lies beneath this > pad would be most appreciated... > > Thx... > -Scott
|