I couldn't remember if this was an actual feature now
or if it was just one of Rusty's wish items (right after
datalogging).
Actually, I think my wish list item was to get the
EC-2 instructions in word format, so I could cut and paste this
rather than having to type it. Anyway, here is the
procedure to copy A to B.
Rusty
(don't say I never gave you anything)
1- Turn the EC-2 power off.
2- Select controller A using the controller A/B switch on the
PCM.
3- Select mode 2 with the Mode Select
switch.
4- Press and hold the Program Store
switch.
5- While
holding down the Program Store switch, turn on the power switch to the
EC-2.
6- Keep holding the Program Store switch for about 2 seconds,
then release it.
7- All programming entries which you have performed on
controller A will now be copied to controller
B.