Return-Path: <13brv3@bellsouth.net> Received: from imf19aec.mail.bellsouth.net ([205.152.59.67] verified) by logan.com (CommuniGate Pro SMTP 4.2.8) with ESMTP id 619600 for flyrotary@lancaironline.net; Mon, 24 Jan 2005 12:54:56 -0500 Received-SPF: pass receiver=logan.com; client-ip=205.152.59.67; envelope-from=13brv3@bellsouth.net Received: from rd ([65.6.194.9]) by imf19aec.mail.bellsouth.net (InterMail vM.5.01.06.11 201-253-122-130-111-20040605) with ESMTP id <20050124175424.KVNA2048.imf19aec.mail.bellsouth.net@rd> for ; Mon, 24 Jan 2005 12:54:24 -0500 From: "Russell Duffy" <13brv3@bellsouth.net> To: "Flyrotary List" Subject: Performance coatings- bearing damage? Date: Mon, 24 Jan 2005 11:54:51 -0600 Message-ID: <01e901c5023d$cd65ab20$6101a8c0@rd> MIME-Version: 1.0 Content-Type: multipart/alternative; boundary="----=_NextPart_000_01EA_01C5020B.82CB3B20" X-Priority: 3 (Normal) X-MSMail-Priority: Normal X-Mailer: Microsoft Outlook, Build 10.0.6626 X-MimeOLE: Produced By Microsoft MimeOLE V6.00.2900.2527 Importance: Normal This is a multi-part message in MIME format. ------=_NextPart_000_01EA_01C5020B.82CB3B20 Content-Type: text/plain; charset="US-ASCII" Content-Transfer-Encoding: quoted-printable Greetings, =20 I just talked to Brad at Performance Coatings, and he said they try to = batch items together, to keep from wasting material. For scheduling purposes, it's interesting to note that they do piston tops, and rotors on = Wednesdays. They charge $45 for each rotor. The process includes blasting the rotor faces, spraying on the coating, and curing it at 350 degrees. They have = a fixture that they use on rotors, which keeps anything from touching the bearing. =20 =20 Will the bearing be damaged at 350 degrees? I'm thinking there's a good chance it will. =20 =20 Thanks, Rusty (still undecided) =20 ------=_NextPart_000_01EA_01C5020B.82CB3B20 Content-Type: text/html; charset="US-ASCII" Content-Transfer-Encoding: quoted-printable Message
Greetings,
 
I just talked = to Brad at=20 Performance Coatings, and he said they try to batch items together, to = keep from=20 wasting material.  For scheduling purposes, it's interesting to = note that=20 they do piston tops, and rotors on Wednesdays.   They = charge $45=20 for each rotor.  The process includes blasting the rotor faces, = spraying on=20 the coating, and curing it at 350 degrees.  They have a fixture = that they=20 use on rotors, which keeps anything from touching the=20 bearing.  
 
Will the = bearing be damaged=20 at 350 degrees?  I'm thinking there's a = good chance=20 it will. 
 
Thanks,
Rusty (still=20 undecided)
 
------=_NextPart_000_01EA_01C5020B.82CB3B20--