Return-Path: Received: from imf22aec.mail.bellsouth.net ([205.152.59.70] verified) by logan.com (CommuniGate Pro SMTP 4.2.5) with ESMTP id 493744 for flyrotary@lancaironline.net; Sun, 31 Oct 2004 23:33:28 -0500 Received-SPF: pass receiver=logan.com; client-ip=205.152.59.70; envelope-from=sqpilot@bellsouth.net Received: from Carol ([209.214.44.211]) by imf22aec.mail.bellsouth.net (InterMail vM.5.01.06.11 201-253-122-130-111-20040605) with SMTP id <20041101043256.DKTR2430.imf22aec.mail.bellsouth.net@Carol> for ; Sun, 31 Oct 2004 23:32:56 -0500 Message-ID: <008e01c4bfcb$d5d9e5f0$d32cd6d1@Carol> From: "paul" To: "Rotary motors in aircraft" References: Subject: Re: [FlyRotary] Re: Phase one complete, official climb results disappointing Date: Sun, 31 Oct 2004 22:32:44 -0600 MIME-Version: 1.0 Content-Type: multipart/alternative; boundary="----=_NextPart_000_008B_01C4BF99.8A915BA0" X-Priority: 3 X-MSMail-Priority: Normal X-Mailer: Microsoft Outlook Express 6.00.2900.2180 X-MIMEOLE: Produced By Microsoft MimeOLE V6.00.2900.2180 This is a multi-part message in MIME format. ------=_NextPart_000_008B_01C4BF99.8A915BA0 Content-Type: text/plain; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable Message ----- Original Message -----=20 From: Russell Duffy=20 To: Rotary motors in aircraft=20 Sent: Sunday, October 31, 2004 6:24 PM Subject: [FlyRotary] Re: Phase one complete, official climb results = disappointing Congratulations Rusty! TJ=20 Thanks Tommy. I forgot to mention the best part of this. The engine = has now gone 8+ hours without having the cowl removed. I can see = through the cheek extension holes in the back, as well as the air exit = on the bottom, and there hasn't been any leakage, or problems that I can = see. I think I'm finally ready to start trusting it... maybe as far as = Mobile, AL :-) Rusty I dare you. Paul Conner ------=_NextPart_000_008B_01C4BF99.8A915BA0 Content-Type: text/html; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable Message
 
----- Original Message -----
From:=20 Russell=20 Duffy
Sent: Sunday, October 31, 2004 = 6:24=20 PM
Subject: [FlyRotary] Re: Phase = one=20 complete, official climb results disappointing

Congratulations=20 Rusty! TJ 
 
 
Thanks = Tommy. =20 I forgot to mention the best part of this.  The engine has = now gone=20 8+ hours without having the cowl removed.  I can see through the = cheek=20 extension holes in the back, as well as the air exit on the bottom, = and there=20 hasn't been any leakage, or problems that I can see.  I think I'm = finally=20 ready to start trusting it... maybe as far as Mobile, AL =20 :-)
 
Rusty
 
I = dare=20 you.   Paul = Conner
------=_NextPart_000_008B_01C4BF99.8A915BA0--