Mailing List lml@lancaironline.net Message #69002
From: Craig Berland <cberland@systems3.net>
Sender: <marv@lancaironline.net>
Subject: Re: [LML] Re: JACK CUP POINT END
Date: Sat, 18 Jan 2014 14:43:07 -0500
To: <lml@lancaironline.net>
Minor correction. I just made two jack cups for the IV-P and the thread is 7/16. As the 7/16 thread is kinda an orphan, I thought noting it may save somebody some grief. The pitch is 20.
Craig Berland
7VG

Sent from my iPad

On Jan 17, 2014, at 3:16 PM, "Robert R Pastusek" <rpastusek@htii.com> wrote:

George,

If the IV/IV-P was built according to the plans, the two fuselage jack points should be immediately forward of the main wing spar box and about 20” either side of the fore/aft centerline, on the bottom of the fuselage. The jacking “cups” thread into vertical steel tubes that are bolted to the front of the spar box. These should be visible under the front edge of the pilot/copilot seats. If you’re looking from under the airplane, they should appear as two round 3/8” holes, and a 3/8” fine thread bolt should screw into them. The jacking cups themselves consist of steel “cups” that will fit over the top of a jack head (about 1” in diameter) with a threaded 3/8” shaft welded to the back side…this part screws into the fuselage.

 

Hope this helps.


BOB

 


 




Subscribe (FEED) Subscribe (DIGEST) Subscribe (INDEX) Unsubscribe Mail to Listmaster