Return-Path: Sender: "Marvin Kaye" To: lml@lancaironline.net Date: Sat, 26 Mar 2005 11:41:13 -0500 Message-ID: X-Original-Return-Path: Received: from imo-m25.mx.aol.com ([64.12.137.6] verified) by logan.com (CommuniGate Pro SMTP 4.3c3) with ESMTP id 821844 for lml@lancaironline.net; Sat, 26 Mar 2005 09:22:24 -0500 Received-SPF: pass receiver=logan.com; client-ip=64.12.137.6; envelope-from=VTAILJEFF@aol.com Received: from VTAILJEFF@aol.com by imo-m25.mx.aol.com (mail_out_v37_r5.33.) id q.1ab.35288b61 (4214) for ; Sat, 26 Mar 2005 09:21:31 -0500 (EST) From: VTAILJEFF@aol.com X-Original-Message-ID: <1ab.35288b61.2f76c9eb@aol.com> X-Original-Date: Sat, 26 Mar 2005 09:21:31 EST Subject: Re: [LML] LIV - Fuselage Bottom X-Original-To: lml@lancaironline.net MIME-Version: 1.0 Content-Type: multipart/alternative; boundary="-----------------------------1111846891" X-Mailer: 9.0 Security Edition for Windows sub 1200 -------------------------------1111846891 Content-Type: text/plain; charset="UTF-8" Content-Transfer-Encoding: quoted-printable Content-Language: en =20 In a message dated 3/25/2005 6:00:18 P.M. Central Standard Time, =20 npaczkowski@telus.net writes: Is there anything (besides a coat of WLS) that I ought to be doing to the=20 underside of the fuselage before I secure it in the jig for attaching the=20 turtleback and tail etc? For example =E2=80=93 should I be fitting the mai= n gear doors at=20 this time? Are people using the carbon fiber main gear doors that come with= =20 the kit or replacing these with aluminum? Thanks for your help. By all means install your carbon fiber gear doors before you put on the top=20= =20 pieces. The top goes on almost last. =20 Jeff Edwards LIVP N619SJ -------------------------------1111846891 Content-Type: text/html; charset="UTF-8" Content-Transfer-Encoding: quoted-printable Content-Language: en
In a message dated 3/25/2005 6:00:18 P.M. Central Standard Time,=20 npaczkowski@telus.net writes:
<= FONT=20 style=3D"BACKGROUND-COLOR: transparent" face=3D"Times New Roman" color=3D#= 000000=20 size=3D3>

Is there anything (besides a coat of WLS) that I= ought=20 to be doing to the underside of the fuselage before I secure it in the jig= for=20 attaching the turtleback and tail etc?  For example =E2=80=93 should=20= I be fitting=20 the main gear doors at this time? Are people using the carbon fiber main g= ear=20 doors that come with the kit or replacing these with aluminum? Thanks for=20= your=20 help.

By all means install your carbon fiber gear doors before you put on the= top=20 pieces. The top goes on almost last.
 
Jeff Edwards
LIVP N619SJ
-------------------------------1111846891--