Mailing List lml@lancaironline.net Message #18909
From: Larry Henney <LHenney@dellepro.com>
Sender: Marvin Kaye <marv@lancaironline.net>
Subject: RE: [LML] Re: LNC2 Horiz.stab hinge center line
Date: Fri, 23 May 2003 02:23:32 -0400
To: <lml>
Dale Writes:

so I ground off the rivets to
remove the nuts and floxed the holes. Now I can make new nut plates to
hysol
over the old plates, re'drill, and use a longer bolt.

If I'm hearing you correctly, you have 20 extra #3 holes packed with
flox in your horizontal trailing spar.  I'd suggest 5 Bid on either side
(10 Total) of the pad area to account for the spar strength degradation.
A little flox in a hole is often a good fix.  In this case however the
structural integrity of your spar should be analyzed.  I'd encourage you
to discuss this with Lancair.

Larry Henney
N360LH

Subscribe (FEED) Subscribe (DIGEST) Subscribe (INDEX) Unsubscribe Mail to Listmaster