X-Virus-Scanned: clean according to Sophos on Logan.com Return-Path: Received: from [66.219.56.248] (HELO qnsi-xch.qnsi.net) by logan.com (CommuniGate Pro SMTP 5.0.7f) with ESMTP id 958150 for flyrotary@lancaironline.net; Sun, 29 Jan 2006 15:36:41 -0500 Received-SPF: none receiver=logan.com; client-ip=66.219.56.248; envelope-from=bhughes@qnsi.net Content-class: urn:content-classes:message Return-Receipt-To: "Bobby J. Hughes" MIME-Version: 1.0 Content-Type: multipart/alternative; boundary="----_=_NextPart_001_01C62513.C1E473FE" Disposition-Notification-To: "Bobby J. Hughes" X-MimeOLE: Produced By Microsoft Exchange V6.5.6944.0 Subject: RE: [FlyRotary] Re: EGT probes Date: Sun, 29 Jan 2006 14:37:01 -0600 Message-ID: X-MS-Has-Attach: X-MS-TNEF-Correlator: Thread-Topic: [FlyRotary] Re: EGT probes Thread-Index: AcYlEodzDf/YNy+fRku5SEU91ZnHygAAS9mg From: "Bobby J. Hughes" To: "Rotary motors in aircraft" This is a multi-part message in MIME format. ------_=_NextPart_001_01C62513.C1E473FE Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: quoted-printable Ed, =20 Are you using the clamp type? =20 Bobby ________________________________ From: Rotary motors in aircraft [mailto:flyrotary@lancaironline.net] On Behalf Of Ed Anderson Sent: Sunday, January 29, 2006 2:27 PM To: Rotary motors in aircraft Subject: [FlyRotary] Re: EGT probes Bobby, I have used the microair probes without the weld-on boss since 1997 with no problems. So I don't believe the weld-on boss is necessary for NA 13B use. =20 FWIW =20 Ed=20 =20 Ed Anderson Rv-6A N494BW Rotary Powered Matthews, NC eanderson@carolina.rr.com ----- Original Message -----=20 From: Bobby J. Hughes =20 To: Rotary motors in aircraft =20 Sent: Sunday, January 29, 2006 1:11 PM Subject: [FlyRotary] Re: EGT probes Buly, =20 Did the Microair probes come with the weld on boss? If not, do you remember what size threads? =20 Thanks, =20 Bobby (waiting on parts, ordering more parts) =20 ________________________________ From: Rotary motors in aircraft [mailto:flyrotary@lancaironline.net] On Behalf Of Bulent Aliev Sent: Thursday, January 19, 2006 9:18 PM To: Rotary motors in aircraft Subject: [FlyRotary] Re: EGT probes =09 =09 John, I have installed one Microair probe for each rotor. Got them from Aircraft Spruce. Adjustable for depth, cost about $25-26 each and guaranteed for life? =09 =09 Bulent "Buly" Aliev http://tinyurl.com/dcy36 On Jan 19, 2006, at 8:13 PM, John Downing wrote: =09 Before all this discussion on lag and lead, I hadn't given much thought to monitoring the EGT. But it looks like it is time to order up the probes and the instrument. If something is happening, it needs to monitored. Thanks for all the heads up information. JohnD ------_=_NextPart_001_01C62513.C1E473FE Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable
Ed,
 
Are you using the clamp = type?
 
Bobby


From: Rotary motors in aircraft=20 [mailto:flyrotary@lancaironline.net] On Behalf Of Ed=20 Anderson
Sent: Sunday, January 29, 2006 2:27 PM
To: = Rotary=20 motors in aircraft
Subject: [FlyRotary] Re: EGT=20 probes

Bobby,  I have used the microair probes = without the=20 weld-on boss since 1997 with no problems.   So I don't believe = the=20 weld-on boss is necessary for NA 13B use.
 
FWIW
 
Ed
 
Ed Anderson
Rv-6A N494BW Rotary = Powered
Matthews,=20 NC
eanderson@carolina.rr.com
----- Original Message -----
From:=20 Bobby J. = Hughes=20
Sent: Sunday, January 29, 2006 = 1:11=20 PM
Subject: [FlyRotary] Re: EGT = probes

Buly,
 
Did the Microair probes come with the weld on = boss? If=20 not, do you remember what size threads?
 
Thanks,
 
Bobby
(waiting on parts, ordering more=20 parts)
 


From: Rotary motors in aircraft=20 [mailto:flyrotary@lancaironline.net] On Behalf Of Bulent=20 Aliev
Sent: Thursday, January 19, 2006 9:18 PM
To: = Rotary=20 motors in aircraft
Subject: [FlyRotary] Re: EGT=20 probes

John, I have installed one Microair probe for each = rotor. Got=20 them from Aircraft Spruce. Adjustable for depth, cost about $25-26 = each and=20 guaranteed for life?
Bulent "Buly" Aliev

On Jan 19, 2006, at 8:13 PM, John Downing wrote:
Before all this = discussion on=20 lag and lead, I hadn't given much thought to monitoring the = EGT.  But=20 it looks like it is time to order up the probes and the = instrument.  If=20 something is happening, it needs to monitored.  Thanks for all = the=20 heads up information.  JohnD

------_=_NextPart_001_01C62513.C1E473FE--