|
4a. Retry to send Flap-control information to Mark Davis...
Thank you for "relaying" on lml!! :-)
Best regards
Lino
------------------------------------------------------------
Missaggia Engineering GmbH
Ingenieurbüro für Automation,
Hard & Software-Entwicklung,
Netzwerk & Kommunikationstechnik
Bahnhofstrasse 46
CH-9450 Altstaetten (SG)
Tel: +41 71 750 03 35
Fax: +41 71 750 03 36
Mail: lino.missaggia@m-engineering.net
Web: http://www.m-engineering.net
------------------------------------------------------------
-----Ursprüngliche Nachricht-----
Von: Lino Missaggia (G) [mailto:lino.missaggia@m-engineering.net]
Gesendet: Donnerstag, 17. August 2006 10,58
An: 'Mark Davis'
Betreff: WG: FCTRL0002 Questions
3. Retry:
Hope this works now!? :-)
Regards
Lino
------------------------------------------------------------
Missaggia Engineering GmbH
Ingenieurbüro für Automation,
Hard & Software-Entwicklung,
Netzwerk & Kommunikationstechnik
Bahnhofstrasse 46
CH-9450 Altstaetten (SG)
Tel: +41 71 750 03 35
Fax: +41 71 750 03 36
Mail: lino.missaggia@m-engineering.net
Web: http://www.m-engineering.net
------------------------------------------------------------
-----Ursprüngliche Nachricht-----
Von: Lino Missaggia (G) [mailto:lino.missaggia@m-engineering.net]
Gesendet: Montag, 7. August 2006 06,04
An: 'Mark Davis'
Betreff: WG: FCTRL0002 Questions
2. Retry:
it seems, that your Email address, I have, doesn't work correctly!?
These recipients of your message have been processed by the mail server:
Diese Nachrichtenempfänger wurden vom Mail-Server verarbeitet: Ces
destinataires ont été traités par le serveur de messagerie :
mdavis@adnc.com;
-> Failed
Fehlgeschlagen
Échec
Error-Code; 4.4.7 (delivery time expired)
(Lieferzeit verfallen)
(délai de distribution expiré)
-----Ursprüngliche Nachricht-----
Von: Lino Missaggia (G) [mailto:lino.missaggia@m-engineering.net]
Gesendet: Dienstag, 1. August 2006 10,29
An: 'Mark Davis'
Betreff: FCTRL0002 Questions
1. Retry to send the answer, hope this works!!?? :-)
-----Ursprüngliche Nachricht-----
Von: Lino Missaggia (G) [mailto:lino.missaggia@m-engineering.net]
Gesendet: Donnerstag, 27. Juli 2006 10,15
An: 'Mark Davis'
Betreff: AW: FCTRL0002 Questions
Dear Mr. Davis,
Thank you for your Message concerning our Flap-Control-box!
You are right! The box-electronic itself works with 24V! And the relaiys
does it too!
BUT!! :-)
You're also right, that they won't be alive as long as they should...!
In the last years we had more customers with 24V-systems and I tested the
system here in Switzerland on a "cirrus" airvraft, with 24V system and
stronger Flap-motors.. :-(
=> We changed the relays to newer (better) ones AND 24V-types (in 24V
systems)!
So, if you have a "Bosch"-reseller in your vicinity, you may buy and change
the relays yourself, or if you prefer, I may send you this from
Switzerland!?
Perhaps you know Mr. Mark Mahnke from Oregon (an experienced Lancair-builder
and user/installer of our Control-boxes)? He just ordered three systems
(24V!). Perhaps it's less expensive for you, if I send him your 24V relays
and he send them to you!?
Also the schematics to wire the box AND the sensor: You should have received
it with the box!? But it is still available and I'll attach the whole user
manual to that email..
For explanation:
The wire-color-markings for the sensor, shown in the schematics, are the
following:
Rt (rot): red
Br (braun): brown
Or (orange): orange
Please let me know, what do you prefer concerning the relays...
Hope this information will help you, else let me know, please!
Best regards
Lino Missaggia
------------------------------------------------------------
Missaggia Engineering GmbH
Ingenieurbüro für Automation,
Hard & Software-Entwicklung,
Netzwerk & Kommunikationstechnik
Bahnhofstrasse 46
CH-9450 Altstaetten (SG)
Tel: +41 71 750 03 35
Fax: +41 71 750 03 36
Mail: lino.missaggia@m-engineering.net
Web: http://www.m-engineering.net
------------------------------------------------------------
-----Ursprüngliche Nachricht-----
Von: Mark Davis [mailto:mdavis@adnc.com]
Gesendet: Mittwoch, 26. Juli 2006 04,32
An: lino.missaggia@m-engineering.net
Betreff: FCTRL0002 Questions
Dear Mr. Missaggia:
Several years ago I purchased one of your FCTRL0002 Flap Control units
and am unfortunately only now am about to install it in my Lancair
Legacy 2000 (I'm a very slow builder). As I mentioned at the time of
purchase, my Legacy has a 24 VDC electrical system and I am still a bit
concerned that your 12 VDC system will work with long term reliability
with twice that voltage applied to it and to the flap motor. You have
previously indicated that there should be no problem but, before I go to
the effort to wire and install it I would like to have you confirm that
for me once again. I am not particularly knowledgeable about the
circuits in the system but suspect that the electronics may well handle
the higher voltage without difficulty. My concern is that possible
failure of the relays at the higher voltage would prevent effective
reversion to the manual mode of the system and this would be
unacceptable. I would very much appreciate your frank appraisal of the
reliability and longevity of your system at the higher voltage.
At the time of purchase, I also purchased your flap position sensor and
have now had a chance to carefully compare it and the one provide by
Lancair with the SKF flap motor. Your sensor appears to be very well
made and I would like very much to us it but, since it came with no
installation instructions or wiring diagram, I am uncertain about how to
go about this. I would greatly appeciate your help in getting such
instructions/diagrams to avoid having to use the Lancair provided system
instead. Any other information you can provide to someone as
electronically challenged as I am to help with installation of your
system will be greatly appreciated.
Sincerely,
Mark Davis
San Diego, CA USA
|
|