Mailing List lml@lancaironline.net Message #34120
From: Joseph Neustein, MD <jn@elp.rr.com>
Sender: <marv@lancaironline.net>
Subject: Battery location ES-P
Date: Wed, 25 Jan 2006 01:54:45 -0500
To: <lml@lancaironline.net>
Would appreciate some input on where to locate the two 24 volt batteries on
a dual bus ES-P with  MT-4 Prop, PerformanceEngine TSIO550, twin turbo 3
intercoolers, engine driven airconditioning (compresser and fan aft of the
baggage compartment), and probable built in aerox four place O2.  I was
hoping to weigh and balance after hanging the engine and prop before
deciding, but the nose fork is still not in sight with no delivery date and
the panel wiring is ready to be finished.  Word of mouth suggests the ES is
nose heavy and would do well with the batteries aft.


Thanks

Joseph Neustein, MD
Lancair ES-P N36YZ (reserved)70%



Subscribe (FEED) Subscribe (DIGEST) Subscribe (INDEX) Unsubscribe Mail to Listmaster