X-Virus-Scanned: clean according to Sophos on Logan.com Return-Path: Sender: To: lml@lancaironline.net Date: Fri, 02 Dec 2005 01:21:03 -0500 Message-ID: X-Original-Return-Path: Received: from outbound-mail.lax.untd.com ([64.136.28.164] verified) by logan.com (CommuniGate Pro SMTP 5.0.2) with SMTP id 853053 for lml@lancaironline.net; Thu, 01 Dec 2005 11:20:36 -0500 Received-SPF: pass receiver=logan.com; client-ip=64.136.28.164; envelope-from=jkezele@juno.com Received: from webmail13.lax.untd.com (webmail13.lax.untd.com [10.131.27.153]) by smtpout06.lax.untd.com with SMTP id AABB28JXAAJSV892 for (sender ); Thu, 1 Dec 2005 08:19:44 -0800 (PST) Received: (from jkezele@juno.com) by webmail13.lax.untd.com (jqueuemail) id LA58ZPPM; Thu, 01 Dec 2005 08:19:38 PST Received: from [12.174.32.2] by webmail13.lax.untd.com with HTTP: Thu, 1 Dec 2005 16:19:35 GMT X-Originating-IP: [12.174.32.2] Mime-Version: 1.0 From: "jkezele@juno.com" X-Original-Date: Thu, 1 Dec 2005 16:19:35 GMT X-Original-To: lml@lancaironline.net Subject: hydraulic lines in closeout rib X-Mailer: Webmail Version 4.0 Content-Transfer-Encoding: quoted-printable Content-Disposition: inline Content-Type: text/plain X-Original-Message-Id: <20051201.081938.20213.19100@webmail13.lax.untd.com> X-ContentStamp: 8:4:69097859 X-UNTD-OriginStamp: 9OvJUXd2tUqhLb258iQtPQ9NMvK5dNdV+WUIHS/cvCWkfnPBOn4bkA== X-UNTD-Peer-Info: 10.131.27.153|webmail13.lax.untd.com|webmail13.lax.untd.com|jkezele@juno.com I have looked at blueprint K and can see that a section of honeycomb is removed in addition to the area for the inner gear door hinge where t= he hydraulic bulkhead fittings go. The print refers to the inner (assuming the cockpit side) of the closeout rib has the material removed and then a 3 BID as per print K and chapter 16 in the manual. I have seen no mention of this except for reference on the print and in ch 16, however in the chapter about the stub wing and the close out rib placement,there is mentioned a discription of the step down 4 BID's (total 12)right over the area discribed to have the honeycomb removed to place the 3 BID for later bulkhead placement of three hydraulic lines if you have the inner gear door hyd upgrade. This seems to me that even if the honeycomb is removed the hydraulic fittings would be going through 15 BID minimum not counting the 2 BID on the gear well side. So how are you folks dealing with this? 1. is there a better way? 2. do you remove the honeycomb from the gear well side and then 3BID and drill the 7/16 hole through the inner 12 bid layup aft of the main spar. pictures would be a great help. I have outback gear, and receintly purchase the 360SFB MKII that is part= ially complete with stub wing mounted and the close out rib installed. Thanks for your help John Kezele