Mailing List lml@lancaironline.net Message #21577
From: Giffen A. Marr <GAMarr@charter.net>
Sender: Marvin Kaye <marv@lancaironline.net>
Subject: Elevator Trim Tab Servo Wire routing
Date: Sun, 23 Nov 2003 22:12:56 -0500
To: <lml@lancaironline.net>
Message
I am finishing up the Horizontal Stab and Elevators. The IV-P plans are not very specific on how you route the wire from the elevator to the fuselage. Would like any suggestions. My thought is to run a flexible tube from the elevator, passing by the pivot point of the elevator, then down into the fuselage and forward. I do not want to run the wire at this time, but put in a flexible tube so that I have a wire run when I string the electrical cable from both the elevator and the rudder. I would plan on running the rudder the same way and then from the access panel, a single route to the instrument panel.
 
Giffen A. Marr
Lancair IV-P/20B 5+% 
Subscribe (FEED) Subscribe (DIGEST) Subscribe (INDEX) Unsubscribe Mail to Listmaster