X-Virus-Scanned: clean according to Sophos on Logan.com X-SpamCatcher-Score: 2 [X] Return-Path: Received: from imf25aec.mail.bellsouth.net ([205.152.59.73] verified) by logan.com (CommuniGate Pro SMTP 5.1.7) with ESMTP id 1900544 for flyrotary@lancaironline.net; Sun, 04 Mar 2007 10:30:28 -0500 Received-SPF: none receiver=logan.com; client-ip=205.152.59.73; envelope-from=rusty@radrotary.com Received: from ibm69aec.bellsouth.net ([65.6.194.9]) by imf25aec.mail.bellsouth.net with ESMTP id <20070304152930.FLER1884.imf25aec.mail.bellsouth.net@ibm69aec.bellsouth.net> for ; Sun, 4 Mar 2007 10:29:30 -0500 Received: from rd ([65.6.194.9]) by ibm69aec.bellsouth.net with ESMTP id <20070304152927.DAHQ29413.ibm69aec.bellsouth.net@rd> for ; Sun, 4 Mar 2007 10:29:27 -0500 From: "Russell Duffy" To: "'Rotary motors in aircraft'" Subject: RE: [FlyRotary] Re: new "project" fo Rusty Date: Sun, 4 Mar 2007 09:29:23 -0600 Message-ID: <018601c75e71$e5fd3300$6e01a8c0@rd> MIME-Version: 1.0 Content-Type: multipart/alternative; boundary="----=_NextPart_000_0187_01C75E3F.9B62C300" X-Priority: 3 (Normal) X-MSMail-Priority: Normal X-Mailer: Microsoft Outlook, Build 10.0.6822 X-MIMEOLE: Produced By Microsoft MimeOLE V6.00.2900.3028 Importance: Normal Thread-Index: AcdebXH52RoLID1pQ/6S7qDoyoXNmAAA3Cew In-Reply-To: This is a multi-part message in MIME format. ------=_NextPart_000_0187_01C75E3F.9B62C300 Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: quoted-printable RB-alu side housings, make it a P-port and you are way ahead of the weight-game...!!=20 =20 The first problem with that plan is that the RB housings essentially = don't exist. They've never finished the front housing, and have only = sporadically offered rear and intermediate housings. I just called them again a = couple weeks ago, and they told me the same thing they've said for at least 3 years- "we're working on them, and they should be ready soon". =20 =20 Rusty =20 ------=_NextPart_000_0187_01C75E3F.9B62C300 Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable Message
RB-alu side housings, make it a P-port and you are way ahead of the = weight-game...!! 
 
The first=20 problem with that plan is that the RB housings essentially don't=20 exist.  They've never finished the front housing, and have only=20 sporadically offered rear and intermediate housings. I just called them = again=20 a couple weeks ago, and they told me the same thing they've said = for at=20 least 3 years- "we're working on them, and they should be ready=20 soon".   
 
Rusty
 
------=_NextPart_000_0187_01C75E3F.9B62C300--